Two bridge projects are slated to start today on US 50 at Montgomery. One lane of 50 over two bridges over Prairie Creek will be closed west of County Road 800-East. There’ll be a signal to direct traffic in the open 12 foot lanes. Those with wide loads need to find another route. Contractors are rehabilitating the approaches and surfaces of the bridges.